| Project Title: |
BA ENERGY HEARTLAND UPGRADER |
| Service Type: |
Industrial Construction |
| Location: |
Fort Saskatchewan, Alberta |
| Client Contact: |
BA Energy, Calgary, Alberta |
| Work Scope: |
Site Stripping, Site Grading, Cooling Water Pond Construction, Fabrication and Installation Under a Continuous Dewatering Operation of a 5.7km long Fire Water System and a 1.4km long Oily Water Sewer System, Fabrication and Installation of a 700m Stainless Steel Waste Disposal Line, Construction of 4 Tank Pads complete with Liner and Cathodic Protection Grid, Site Gravel Road Construction, Installation of Perimeter Fencing |
| Contract Value: |
Lump Sum/Unit Price Combination - $41.2 million |
| Comments: |
Work was continuous through all seasons. Due to a high water table throughout the site, the installation and continuous operation of a well point dewatering system was required for the duration of the installation of the firewater and oily water sewer system.  |
|
|
|